Haiyue Delivers a 5,000 m³ Double Membrane Gas Holder for a Slaughterhouse Wastewater Project

November 27, 2026

Haiyue Delivers a 5,000 m³ Double Membrane Gas Holder for a Slaughterhouse Wastewater Project

In a slaughterhouse wastewater treatment plant, biogas production varies with wastewater flow and organic loading, while the boiler draws gas according to the facility’s heating needs. A gas holder bridges the gap by storing biogas when demand is low and supplying it when demand rises.

At a slaughterhouse wastewater treatment project in Binzhou, Shandong Province, Qingdao Haiyue’s 5,000 m³ double membrane gas holder has been installed and commissioned. Connected to the biogas collection pipeline of an upflow anaerobic sludge blanket (UASB) reactor, the holder stores recovered biogas for use in the plant’s boiler. The system is now operating steadily.

How the 5,000 m³ Gas Holder Balances Biogas Production and Boiler Demand

Slaughterhouse wastewater contains blood, fats, and suspended solids. After pretreatment, the organic matter in the wastewater can be converted into biogas through anaerobic digestion. At the Binzhou plant, making consistent use of that biogas for heating depends on balancing fluctuations in production with the boiler’s gas demand.

When selecting a gas holder, Qingdao Haiyue evaluates the effective storage capacity, the required inlet pressure of downstream equipment, and the site’s piping layout. In Binzhou, the gas holder was installed above the UASB reactor’s concrete gas collection dome. The installation required coordination between the concrete foundation and anchoring system, the membrane seals, and the connection to the existing gas collection pipeline. Defining these interfaces during design gives the installation team clear requirements to work from on site.

In-House Manufacturing and On-Site Gas-Tightness Testing

Qingdao Haiyue manufactures its double membrane gas holders in its own factory, where membrane panels are cut and heat-welded. The quality of the inner membrane seams is critical to gas tightness, and the fit between the membrane edge and the anchoring system affects the seal achieved on site. Coordinating factory production and field installation allows the team to verify dimensions and connections before fabrication and trace any issues that arise during installation.

At the Binzhou site, 12 days elapsed from anchoring work to the first biogas fill. The installation team first checked that the anchoring ring was centered and level, then installed the membranes, heat-welded the seams, and checked for leaks. After the control panel was wired and the sensors were calibrated, the system passed a 24-hour gas-tightness test with a measured pressure drop of less than 2%. The team then connected the holder to the biogas collection pipeline and put it into operation.

Project Experience Across Slaughterhouses, Dairy Farms, and Other Biogas Facilities

After three months of continuous operation, the Binzhou customer reported that the holder consistently buffered fluctuations between gas production and consumption, with no abnormal pressure events. The recovered biogas fuels the plant’s boiler and is estimated to replace about 80,000 m³ of natural gas per year.

Qingdao Haiyue’s double membrane gas holder projects also cover livestock manure, food waste, brewery wastewater, and paper mill wastewater. In Xiaogan, Hubei Province, two 300 m³ gas holders were installed at a paper mill wastewater treatment project. In Yichang, Hubei Province, a food waste treatment project was equipped with a 1,000 m³ gas holder. At a dairy farm in Zhangjiakou, Hebei Province, Qingdao Haiyue completed the installation of two 10,000 m³ double membrane gas holders.

These projects vary in biogas output, gas consumption schedules, site layouts, and climate. That experience helps Qingdao Haiyue work with customers to define storage capacity, installation configuration, civil works interfaces, and commissioning responsibilities early, then carry those requirements through manufacturing and on-site installation.

If you are planning a slaughterhouse wastewater treatment project, recovering biogas from industrial wastewater, or expanding an existing biogas system, contact Qingdao Haiyue. Share your project location, average and peak biogas production rates, downstream gas-consuming equipment and operating schedules, and any existing tank drawings or site layouts. We can help you assess the effective storage capacity, installation configuration, and auxiliary equipment your project requires.