Double Membrane Biogas Holder Project for Factory in China

2 sets of 4000m³ gas holders

Zhucheng Large scale Biogas Project: Two sets of 4000m³ gas holders are steadily put into use


In Zhucheng City, Weifang, Shandong Province, a large-scale biogas project is currently under construction—the Zhucheng Project is equipped with two 4,000-cubic-meter double-membrane gas holders. The project is extensive, covering civil construction, gas holder installation, pipeline laying, electrical connections, and automation control. To ensure smooth progress, the company owner and project manager personally supervise the site, closely monitoring construction progress, quality standards, and safety measures, while promptly addressing any issues encountered during construction to ensure that every detail meets the design requirements.

This project not only showcases advanced biogas storage and utilization technology but also provides a complete and efficient solution for the resource recovery of livestock waste in the area. Through the double-membrane gas holders, livestock waste is collected, fermented, and converted into energy, enabling biogas power generation and the production of solid and liquid organic fertilizers. Upon completion, the project will achieve energy self-sufficiency, reduce environmental pollution, and effectively improve soil quality, promoting sustainable agricultural development.

The successful construction of the Zhucheng Project demonstrates the company’s high level of technical and managerial capability and provides valuable experience for regional green energy development and environmental protection. It has become an important benchmark for advancing agricultural circular development and rural revitalization in the region.




Downlaod

+86-13021678731