Industrial wastewater/paper wastewater: 200m ³ double membrane gas cabinet installation completed
Project Address: Jiangmen, Guangdong
The installation of a 200m³ double membrane gas holder for an industrial wastewater and paper wastewater treatment project has been successfully completed in Jiangyin City, Jiangsu Province. The gas holder is designed to safely store and regulate biogas generated during the anaerobic treatment process. With its double membrane structure, the inner membrane stores the biogas while the outer membrane maintains stable pressure through an automatic control system. The system features excellent sealing performance, stable operation, and reliable gas storage, helping improve energy utilization and ensure safe operation of the wastewater treatment facility.
![]()