An introduction to biogas and biomethane

200m³ Manure Slurry Project Gas Holder

200m³ Manure Slurry Project Gas Holder


Address: Liangshan Prefecture, Sichuan Province




The 200m³ manure slurry project gas holder has been successfully delivered and is now entering the installation preparation stage. Located in Liangshan Prefecture, Sichuan Province, this equipment is an important component of the local manure resource utilization project. The gas holder will be used to safely store the biogas generated from anaerobic digestion, ensuring stable gas volume and reliable pressure, and providing a continuous gas supply for power generation, boiler combustion, or biogas upgrading.


The gas holder is built with high-strength membrane material and advanced manufacturing technology, offering excellent airtightness and weather resistance, enabling stable long-term operation even under the unique climate conditions of the plateau region. Once completed, the project will effectively reduce livestock waste discharge, improve energy utilization efficiency, promote local environmental improvement and circular economy development, and contribute to the sustainable development of Liangshan Prefecture.


Downlaod

+86-13021678731